Sokha Hotel Cambodia is a four storey five-star Hotel in Siem Reap.
SF-MGC had completed the installation, stressing and grouting of the Post-Tensioned beams and slabs.
Post-Tensioning was used to allow for a transfer slab, around 12 meters over the hotel lobby area.
Client | Sokimex |
Contractor | SS Builders (Cambodia) Pte. Ltd. |
Consultant | Alliance Design Group |
Alternative Design Engineer | SF-MGC W.L.L |
Construction Period | June 2003 - October 2003 |