Zone B is part of Plot One: Marina Square, and is the third package to be built. It has two towers, both 44 stories high and a podium slab on three levels. SF-MGC won the contract to build the entire Post-Tensioning package.
Every horizontal element except the substructure raft is Post-Tensioned. Structural system: Flat plate PT slab
Client | Tamouh Investment L.L.C |
Architect | GDP |
Engineer | Alliance Design Group |
Construction Period | September 2007 - October 2009 |
Developer | Tamouh |
Main Contractor | SPK-Bina Puri JV |